Status and Plans for a Superconducting RF Accelerator Test Facility at Fermilab

J Leibfritz, Roger Andrews, C Baffes,K Carlson,B Chase, M Church,E Harms, A Klebaner,M Kucera,A Martinez,Sergei Nagaitsev, L E Nobrega,P Piot,J M Reid, M Wendt,Steve Wesseln

mag(2013)

引用 28|浏览12
暂无评分
摘要
The Advanced Superconducting Test Acccelerator (ASTA) is being constructed at Fermilab. The existing New Muon Lab (NML) building is being converted for this facility. The accelerator will consist of an electron gun, injector, beam acceleration section consisting of 3 TTF-type or ILC-type cryomodules, multiple downstream beamlines for testing diagnostics and conducting various beam tests, and a high power beam dump. When completed, it is envisioned that this facility will initially be capable of generating a 750-MeV electron beam with ILC beam intensity. An expansion of this facility was recently completed that will provide the capability to upgrade the accelerator to a total beam energy of 1.5-GeV. Two new buildings were also constructed adjacent to the ASTA facility to house a new cryogenic plant and multiple superconducting RF (SRF) cryomodule test stands. In addition to testing accelerator components, this facility will be used to test RF power systems, instrumentation, and control systems for future SRF accelerators such as the ILC and Project-X. This paper describes the current status and overall plans for this facility.
更多
查看译文
关键词
power transmission,control system,electron beam,power system
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要