The Next Generation Muon Source at J‐PARC/MLF

AIP Conference Proceedings(2010)

引用 12|浏览32
暂无评分
摘要
The Materials and Life Science Facility (MLF) is currently under construction at J-PARC in Tokai, Japan. The muon section of the facility will house the muon production target and four secondary beam lines used to transport the muons into two experimental halls. Currently, one of the four beam lines (the Decay beam line) has been completed and is operational. The beam line currently under construction is the large acceptance beam line (the so called Super-Omega beam line) which, when completed, will produce the highest intensity pulsed muon beam in the world. The expected rate of surface muons for this beam line is 4x10(8) mu(+)/s, and a cloud muon rate of 10(7) mu(-)/s. The beam line consists of the normal-conducting capture solenoids, the superconducting curved transport solenoids, and an axial focusing magnet. The capture solenoids have been fabricated and installed on the beam line, while the transport solenoids are under design. with initial prototype coils under fabrication.
更多
查看译文
关键词
muon,J-PARC,MUSE,MLF,lepton
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要