Optimising Combined Open Pit And Underground Strategic Plan

Brian P Roberts,T Elkington, K Van Olden, M Maulen

TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY(2013)

引用 6|浏览11
暂无评分
摘要
This paper examines the case of a large open pit that is being planned at the site of an existing underground mine. Strategic planning work is undertaken to investigate the project value associated with an expansion of underground operations in conjunction with the proposed pit. Previous analysis by mine planners has determined that any depletion of the available open pit resource that changes the optimum pushback sequence will have a significant negative impact on overall project value. As a result, the main objective of this case study is to determine a strategic plan capable of yielding the optimum economic value for a combined undergroundopen pit operation.To investigate the viability of an underground expansion, a system to identify the stope resource that would add value to a combined operation if mined ahead of the pit is required. The main solution to this problem is the use of a resource model variable that defines the blocks which have greater discounted value if mined by stoping rather than by the open pit. From this potential underground resource, a series of mineable stope shells are generated at various cut-offs. This stope reserve data formed the input to an optimisation process used to optimise the underground mining plan, at a conceptual level, for various project configurations. Then, a dynamic programming mathematical program is used to evaluate the optimum value of a combined open pit and underground operation. The results generated in the case study presented herein provide a clear focus and direction for the next level of detailed mine design and planning.
更多
查看译文
关键词
Optimisation, Open pit, Underground, Transition, Strategy
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要