A Bi-Objective Approach To Reschedule New Jobs In A One Machine Model

INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH(2014)

引用 5|浏览2
暂无评分
摘要
We consider a one machine scheduling model, minimizing a classical objective functioneither the total completion time or the maximum tardinessand with two sets of jobs: one with initial jobs already scheduled and one with new jobs that must be inserted in the schedule. As such rescheduling can create a modification of the schedule of the initial jobs, a disruption objective is considered in addition to the original objective. This additional objective can be formulated in four different ways. Such model has been introduced by Hall and Potts, minimizing either a linear aggregation of the two objectives or the initial objective under a constraint giving an upper limit of the disruption objective. In this paper, the aim is to obtain the set of efficient schedules in regard to the two objectives. Algorithms are provided for the eight possible bi-objective problems and illustrated by some didactic examples.
更多
查看译文
关键词
production scheduling, bi-objective optimization, single machine
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要