A two-agent single-machine scheduling problem with late work criteria

Soft Computing - A Fusion of Foundations, Methodologies and Applications(2015)

引用 32|浏览10
暂无评分
摘要
This paper addresses a two-agent scheduling problem where the objective is to minimize the total late work of the first agent, with the restriction that the maximum lateness of the second agent cannot exceed a given value. Two pseudo-polynomial dynamic programming algorithms are presented to find the optimal solutions for small-scale problem instances. For medium- to large-scale problem instances, a branch-and-bound algorithm incorporating the implementation of a lower bounding procedure, some dominance rules and a Tabu Search-based solution initialization, is developed to yield the optimal solution. Computational experiments are designed to examine the efficiency of the proposed algorithms and the impacts of all the relative parameters.
更多
查看译文
关键词
Scheduling,Two agent,Dynamic programming,Branch-and-bound algorithm
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要