Construction and testing of a 21 GHz ceramic based power extractor

Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the(2003)

引用 5|浏览3
暂无评分
摘要
A ceramic based power extractor operating at 21 GHz was built by DULY Research Inc. and tested at CTF2, the CERN Linear Collider (CLIC) Test Facility. The structure includes a ceramic extractor section, a 2-output-port, circular-to-rectangular waveguide coupler, and a 3-port rectangular waveguide combiner that provides for a single output waveguide. Results of cold tests and full beam tests are presented and compared with theoretical and numerical models.
更多
查看译文
关键词
accelerator rf systems,linear colliders,waveguide couplers,2-output-port,21 ghz,3-port rectangular waveguide combiner,clic test facility,ceramic based power extractor,ceramic extractor section,circular-to-rectangular waveguide coupler,cold tests,dielectric based rf power extractor,full beam tests,two-beam collider,testing,inductors,data mining,ceramics,copper
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要