A method for dealing with multi-objective optimization problem of disassembly processes

ieee(2003)

引用 20|浏览1
暂无评分
摘要
Disassembly of manufactured goods induces both disassembly costs and revenues from the parts saved by the process. Thus, a good trade-off has to be found that depends, both on the depth of the disassembly and on the sequence of operations. This optimization problem depends upon the structure of the disassembly system: if it is made of a single workstation, the costs depend mainly upon the process duration. If the system is a line, the costs depend mainly upon the line balancing, when it is highly manual. In this paper, the authors consider the line structure and propose an algorithm which allow one to find a disassembly sequence that optimizes a very simple function integrating the income from the parts, the material produced by the process and the cycle time of the disassembly line. An example is given to illustrate the proposed algorithm.
更多
查看译文
关键词
costing,optimisation,production management,recycling,disassembly costs,disassembly depth,disassembly line,disassembly processes,disassembly sequence,line balancing,multiobjective optimization,tradeoffs,workstations,cost function,functional integration,shearing,optimization problem,uncertainty,informatics,cycle time,drilling
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要