Split scheduling with uniform setup times

Journal of Scheduling(2014)

引用 9|浏览72
暂无评分
摘要
We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or set up any other job. We concentrate on the basic case in which setup times are job-, machine- and sequence-independent. Problems of this kind were encountered when modelling practical problems in planning disaster relief operations. Our main algorithmic result is a polynomial-time algorithm for minimising total completion time on two parallel identical machines. We argue, why the same problem with three machines is not an easy extension of the two-machine case, leaving the complexity of this case as a tantalising open problem. We give a constant-factor approximation algorithm for the general case with any number of machines and a polynomial-time approximation scheme for a fixed number of machines. For the version with the objective to minimise total weighted completion time, we prove NP-hardness. Finally, we conclude with an overview of the state of the art for other split scheduling problems with job-, machine- and sequence-independent setup times.
更多
查看译文
关键词
Scheduling,Job splitting,Setup times,Complexity theory,Approximation algorithms
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要