Simulation of mobile falsework utilization methods in bridge construction

Winter Simulation Conference(2012)

引用 3|浏览4
暂无评分
摘要
Scaffolds and shoring systems are generally referred to as the falsework in bridge construction, serving as temporary structures to support bridge span construction. The falsework cost usually accounts for 50-70% of the total project concrete budget. Falsework installation and advancing methods can greatly impact the completion time and actual cost. Thus, simulation can be instrumental in planning bridge construction operations and analyzing various options by evaluating postulated “what-if” scenarios. This study uses a previously constructed bridge in Sweden as a case study to test three feasible construction sequence alternatives. One of these alternatives was implemented on the actual construction of this bridge. Modeling was performed in Simphony, which captures the unique construction sequence requirements and constraints, resulting in project durations for each alternative. Results from simulation experiments were corroborated by the construction engineer who had worked on the bridge project in terms of the advantages that each alternative method possesses.
更多
查看译文
关键词
bridge construction operation,falsework installation,budgeting,bridge construction operation planning,bridge span construction,simphony,bridges (structures),construction engineer,feasible construction sequence alternative,actual construction,temporary structures,total project concrete budget,scaffold systems,structural engineering computing,shoring systems,mobile falsework utilization method simulation,planning,sweden,project management,bridge construction,digital simulation,unique construction sequence requirement,what-if scenario evaluation,mobile falsework utilization method,construction sequence alternatives,project duration,bridge project
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要