Performance management via adaptive thresholds with separate control of false positive and false negative errors

Integrated Network Management, pp. 195-202, 2009.

Cited by: 5|Bibtex|Views9|Links
EI
Keywords:
separate component level thresholdoptimal performance thresholds calculationadaptive thresholdfalse negative errorsystem componentMore(23+)

Abstract:

Component level performance thresholds are widely used as a basic means for performance management. As the complexity of managed systems increases, manual threshold maintenance becomes a difficult task. This may result from a) a large number of system components and their operational metrics, b) dynamically changing workloads, and c) comp...More

Code:

Data:

Your rating :
0

 

Tags
Comments