Deadline and QoS Aware Data Warehouse.

VLDB '07: Proceedings of the 33rd international conference on Very large data bases(2007)

引用 3|浏览76
暂无评分
摘要
A data warehouse infrastructure needs to support the requirement of (day time) ad hoc query response time and (night time) batch workload completion time. The following tasks need to be finished in a batch window: (1) Apply one day's delta data to the base tables; (2) refresh MQTs (Materialized Query Tables) for ad hoc queries and batch workloads; (3) run batch queries. Tools are available to optimize each step ; however, many factors need to be considered for improving the overall performance of a data warehouse (i.e. meeting batch window deadline and ad hoc query response time). We have prototyped a Data Warehouse Operation Advisor to systematically study each component contributing to the batch window problem, and then perform global optimization to achieve desired results!
更多
查看译文
关键词
response time,batch query,batch window,batch window problem,batch workload completion time,batch workloads,meeting batch window deadline,day time,night time,data warehouse,QoS aware data warehouse
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要