Investment in electricity networks with transmission switching.

European Journal of Operational Research(2012)

引用 36|浏览7
暂无评分
摘要
We consider the application of Dantzig-Wolfe decomposition to stochastic integer programming problems arising in the capacity planning of electricity transmission networks that have some switchable transmission elements. The decomposition enables a column-generation algorithm to be applied, which allows the solution of large problem instances. The methodology is illustrated by its application to a problem of determining the optimal investment in switching equipment and transmission capacity for an existing network. Computational tests on IEEE test networks with 73 nodes and 118 nodes confirm the efficiency of the approach. (c) 2012 Elsevier B.V. All rights reserved.
更多
查看译文
关键词
Stochastic programming,Electricity capacity planning,Transmission switching,Column generation,Branch and price