Estimating the Production Times in PCB Assembly

Estimating the Production Times in PCB Assembly(2012)

引用 10|浏览11
暂无评分
摘要
Several control problems of PCB assembly industry involve the estimation of the component placement times for various different placement robots. A standard approach, widely used in scientic literature, is to let the time to be a linear function of the number of components. In this paper, we demonstrate that a more realistic model should include additional parameters (e.g., the number of different component types and the board size). Linear multiregression indicates that the coefficient of determination for the improved model is over 90 percent.
更多
查看译文
关键词
pcb assembly industry,realistic model,linear function,pcb assembly,board size,different component type,component placement time,improved model,additional parameter,linear multiregression,various different placement robot,production times,printed circuit board assembly
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要