Initial provisioning and spare parts inventory network optimisation in a multi maintenance base environment

Winter Simulation Conference(2012)

引用 3|浏览4
暂无评分
摘要
Aviation spare parts provisioning is a highly complex problem. Traditionally, provisioning has been carried out using a conventional Poisson-based approach where inventory quantities are calculated separately for each part number and demands from different operations bases are consolidated into one single location. In an environment with multiple operations bases, however, such simplifications can lead to situations in which spares -- although available at another airport -- first have to be shipped to the location where the demand actually arose, leading to flight delays and cancellations. In this paper we demonstrate how simulation-based optimisation can help with the multi-location inventory problem by quantifying synergy potential between locations and how total service lifecycle cost can be further reduced without increasing risk right away from the Initial Provisioning (IP) stage onwards by taking into account advanced logistics policies such as pro-active re-balancing of spares between stocking locations.
更多
查看译文
关键词
aerospace components,airports,inventory management,life cycle costing,logistics,maintenance engineering,optimisation,IP,Poisson-based approach,airport,aviation spare parts provisioning,flight cancellation,flight delay,initial provisioning,inventory quantities,logistics policy,multilocation inventory problem,multimaintenance base environment,simulation-based optimisation,spare parts inventory network optimisation,spares proactive rebalancing,stocking location,synergy potential,total service lifecycle cost
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要