Scalable V&V Effort Estimation for Ultra-Large-Scale Systems

Secure Software Integration and Reliability Improvement(2010)

引用 1|浏览0
暂无评分
摘要
Project planning requires early-on effort estimation. As such, predictions into the future are made with some degree of unavoidable uncertainty. It is likely that some of those predictions will be proven wrong. Thus, solid techniques and concrete procedures are needed to reduce the inaccuracy of estimates. This paper is motivated by practical industrial experiences. It presents a scalable technique that enables scalable effort estimation and is used within an industrial project. The approach determines the critical factors that have to be considered when estimating the V&V effort for systems.
更多
查看译文
关键词
scalable technique,v effort,concrete procedure,project planning,solid technique,ultra-large-scale systems,critical factor,industrial project,early-on effort estimation,scalable effort estimation,scalable v,v effort estimation,practical industrial experience,ultra large scale systems,solids,estimation,hardware,mathematical model,software engineering,statistical analysis,concrete,project management,verification validation,schedules,uncertainty,testing,planning
AI 理解论文
溯源树
样例
生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要